Garibaldi street – phase 1

Greenery and calmer traffic

Rue Garibaldi

Completed

Public spaces

Client

Lyon Metropolis

Designers

Ateliers des paysages (Alain Marguerit)

Calendar

Phase 1 completed in 2016 / Phase 2: October 2016 to end 2017

Rue Garibaldi was designed as an “urban motorway”, in the 1960s. This is a strategic road crossing to the East of the city. Traffic calming and the planting of greenery transformed this large avenue, when work began in 2012. Travel on foot and soft transport methods are encouraged and enhanced.

The project has transfigured the way the urban environment is divided up, offering a “green lung” at the centre of the city:

  • By reducing the number of traffic lanes with a traffic calming effect.
  • By contributing to the enhancement of the adjacent facilities and public spaces.
  • By recreating links with the districts on the east and west of the avenue.
  • By landscaping the length of the avenue to create green continuity – in the long term – between the Tête d’or Park and the Blandan Park.

Nearly 800 m long, this section of rue Vauban and rue Bouchut was the first to be reorganised between 2012 and 2014. It was given a public transport lane, a planted pedestrian walk and a cycle path. This created a better balance of public space in favour of sustainable transport. The work is ongoing with the completion of the new Renée Richard square located in front of the Paul Bocuse indoor food market in autumn 2016. A second phase of developments will be carried out on Rue Bouchut extending as far as Rue d’Arménie, in which the tunnel will be replaced by an open air crossing. Ultimately, vehicles will drive on three lanes on the surface, one of which will be for public transport.